This blog is designed only for textile students of Govt. Polytechnic farrukhabad & Mau. In this blog you can search all type of bteup information that be released by Bteup.ac.in Contact me : 7007489032

Tuesday, February 7, 2017

Fabric manufacturing process- I for Tdp 1st year (IInd semester) Click here

Bteup has created a long syllabus. In which Fabric manufacturing process 1 is added. In this section you have to be read about the 
Winding , warping , Sizing , Drawing-In and Beaming.
So there is nothing available about the syllabus.
So as per students request we have created a Notes which is in very easy language.
Both in Hindi and English
Unit wise collection.
Notes with well diagram.
Click here :
(File size : 13mb)

Please comment us and tell your ideas about the notes and rate our site.
What type of matter you want can tell me on comment section and I will get u that topic.

6 comments:

  1. Replies
    1. I have uploaded the fmp 1 notes. Please download.

      Delete
    2. If you want to more notes then all notes are available in handwritten. You can download it.

      Delete
  2. Sir ji ymp ka notes nahi mil raha hai

    ReplyDelete
  3. Sir i need notes 1st semester textile material plzz help sir

    ReplyDelete